Allendale-Fairfax New Performing Arts Center
The new performing arts center will contain a stage, retractable auditorium seating, multi purpose floor space, group toilets, and a warming kitchen.
Scope: The scope of work includes: sitework, helical piles, earthwork, asphalt and concrete demolition, grading, concrete, steel framing, steel erection, gym floor, masonry, casework, interior painting, wood veneer, acoustical wall panels, projector screen, sealed concrete, electrical, HVAC, plumbing, LVT, ACT, gym equipment and flooring, and ceiling tile replacement throughout the new build Performing Arts Center.
-
Division 02: Demolition
Division 03: Concrete
Division 04: Masonry
Division 05: Metals
Division 06: Casework
Division 07: Roofing, Waterproofing, and thermal protection
Division 08: Glass, Glazing, Doors, Frames, Hardware, and Coiling Doors
Division 09: Metal Stud Framing, Gypsum, ACT Ceiling, Base, Tile Flooring, Wood Flooring, Athletic Floor, Multi Purpose Flooring, Resinous Flooring, and Painting
Division 10: Toilet Accessories, AED Cabinets, Project Screen, Ice Maker, FE and FECs
Division 11: Warming Kitchen Equipment, Bleachers, Basketball Goals
Division 21: Fire Protection
Division 22: Plumbing
Division 23: HVAC
Division 26: Electrical
Division 27: Communications
Division 31: Earthwork
Division 32: Landscaping and Hardscape
Division 33: Utilities
Sign up to receive updates for the Allendale-Fairfax Performing Arts Center project!
For more information:
Patrick Faulkner Pre-Construction Services
803.979.7749 | pfaulkner@mbkahn.com
For certification questions:
Margaret Rush JGM Associates