Allendale-Fairfax New Performing Arts Center

The new performing arts center will contain a stage, retractable auditorium seating, multi purpose floor space, group toilets, and a warming kitchen. 

Scope: The scope of work includes: sitework, helical piles, earthwork, asphalt and concrete demolition, grading, concrete, steel framing, steel erection, gym floor, masonry, casework, interior painting, wood veneer, acoustical wall panels, projector screen, sealed concrete, electrical, HVAC, plumbing, LVT, ACT, gym equipment and flooring, and ceiling tile replacement throughout the new build Performing Arts Center.

  • Division 02: Demolition

    Division 03: Concrete 

    Division 04: Masonry

    Division 05: Metals

    Division 06: Casework

    Division 07: Roofing, Waterproofing, and thermal protection 

    Division 08: Glass, Glazing, Doors, Frames, Hardware, and Coiling Doors 

    Division 09: Metal Stud Framing, Gypsum, ACT Ceiling,  Base, Tile Flooring, Wood Flooring, Athletic Floor, Multi Purpose Flooring, Resinous Flooring, and Painting

    Division 10: Toilet Accessories, AED Cabinets, Project Screen, Ice Maker, FE and FECs

    Division 11: Warming Kitchen Equipment, Bleachers, Basketball Goals

    Division 21: Fire Protection

    Division 22: Plumbing

    Division 23: HVAC

    Division 26: Electrical

    Division 27: Communications

    Division 31: Earthwork

    Division 32: Landscaping and Hardscape

    Division 33: Utilities 

Sign up to receive updates for the Allendale-Fairfax Performing Arts Center project!

For more information:

Patrick Faulkner Pre-Construction Services

803.979.7749 | pfaulkner@mbkahn.com

For certification questions:

Margaret Rush JGM Associates

843.819.4923 | mrush@mbkahn.com